یکشنبه 29 شهریور 1405

جدول آخرین قیمت و نمودار

لیزینگ ایران

ولیز(ریال)

تاریخ اولین کمترین بیشترین پایانی درصد تعداد حجم ارزش
1405/06/29 3,860 3,860 4,080 3,880 (2.27) 236 16M 62B
1405/06/28 3,860 3,850 4,070 3,970 0.25 361 21M 84B
1405/06/25 3,960 3,910 3,960 3,960 2.86 404 26M 105B
1405/06/24 3,850 3,740 3,850 3,850 2.94 435 46M 176B
1405/06/23 3,740 3,740 3,740 3,740 2.75 148 12M 43B
1405/06/22 3,640 3,640 3,640 3,640 2.82 161 12M 43B
1405/06/21 3,540 3,540 3,540 3,540 2.91 31 3M 11B
1405/06/18 3,440 3,440 3,440 3,440 2.99 92 5M 16B
1405/06/17 3,340 3,340 3,340 3,340 2.77 156 15M 50B
1405/06/16 3,210 3,210 3,260 3,250 2.52 156 10M 32B
1405/06/15 3,170 3,110 3,170 3,170 2.92 288 26M 81B
1405/06/14 3,080 2,990 3,170 3,080 0.0 532 41M 125B
1405/06/11 3,080 3,080 3,080 3,080 (2.84) 21 3M 10B
1405/06/10 3,240 3,080 3,260 3,170 0.0 246 16M 52B
1405/06/09 3,000 3,000 3,180 3,170 2.59 443 24M 76B
1405/06/08 3,090 3,090 3,090 3,090 2.86 284 21M 63B
1405/06/07 3,090 3,090 3,090 3,090 2.86 284 21M 63B
1405/06/04 3,004 3,004 3,004 3,004 2.98 75 6M 17B
1405/06/03 2,917 2,917 2,917 2,917 2.97 99 9M 25B
1405/06/02 2,716 2,716 2,882 2,833 1.21 302 25M 71B
1405/06/01 2,799 2,799 2,799 2,799 (2.98) 188 26M 73B
1405/05/31 2,911 2,743 2,911 2,885 2.05 152 23M 67B
1405/05/28 2,827 2,827 2,827 2,827 2.99 78 6M 17B
1405/05/27 2,745 2,745 2,745 2,745 2.96 65 12M 32B
1405/05/26 2,666 2,666 2,666 2,666 2.97 59 6M 17B
1405/05/25 2,589 2,589 2,589 2,589 2.98 85 20M 53B
1405/05/24 2,514 2,514 2,514 2,514 2.99 105 25M 62B
1405/05/21 2,441 2,441 2,441 2,441 3.00 66 13M 31B
1405/05/20 2,441 2,441 2,441 2,441 3.00 66 13M 31B
1405/05/19 2,371 2,330 2,371 2,370 2.95 153 12M 28B
1405/05/18 2,308 2,180 2,308 2,302 2.72 278 44M 100B
1405/05/17 2,241 2,241 2,241 2,241 2.99 42 6M 13B
1405/05/14 2,176 2,176 2,176 2,176 2.98 27 3M 7B
1405/05/13 2,113 2,113 2,113 2,113 2.97 29 3M 6B
1405/05/12 2,113 2,113 2,113 2,113 2.97 29 3M 6B
1405/05/11 2,052 2,052 2,052 2,052 2.96 38 5M 11B
1405/05/10 1,878 1,878 1,994 1,993 2.94 61 6M 12B
1405/05/07 1,938 1,856 1,939 1,936 2.81 96 10M 19B
1405/05/06 1,883 1,883 1,883 1,883 2.95 43 4M 8B
1405/05/05 1,824 1,750 1,845 1,829 2.06 105 8M 15B
1405/05/04 1,792 1,750 1,793 1,792 2.93 94 9M 17B
1405/05/03 1,827 1,721 1,827 1,741 (1.86) 107 14M 25B
1405/04/31 1,781 1,772 1,803 1,773 (2.9) 74 6M 11B
1405/04/30 1,769 1,769 1,828 1,826 2.87 86 5M 9B
1405/04/29 1,772 1,769 1,877 1,775 (2.63) 75 6M 10B
1405/04/28 1,823 1,823 1,823 1,823 (2.98) 26 3M 6B
1405/04/27 1,879 1,879 1,879 1,879 (2.99) 13 3M 5B
1405/04/24 1,879 1,879 1,880 1,879 (2.99) 9 219K 412M
1405/04/22 1,938 1,937 1,938 1,937 (2.96) 48 4M 8B
1405/04/21 1,996 1,996 1,996 1,996 (2.97) 23 3M 6B
1405/04/20 2,178 2,052 2,178 2,057 (2.74) 63 3M 6B
1405/04/17 2,220 2,109 2,220 2,115 (2.71) 94 7M 14B
1405/04/16 2,153 2,150 2,185 2,174 2.45 69 2M 4B
1405/04/15 2,118 2,033 2,122 2,122 2.96 128 10M 20B
1405/04/14 2,118 2,033 2,122 2,122 2.96 128 10M 20B
1405/04/13 2,118 2,033 2,122 2,122 2.96 128 10M 20B
1405/04/10 2,118 2,033 2,122 2,122 2.96 128 10M 20B
1405/04/09 2,046 2,045 2,154 2,061 (2.23) 167 11M 23B
1405/04/08 2,090 2,082 2,190 2,108 (1.77) 99 5M 11B
1405/04/07 2,156 2,146 2,156 2,146 (2.98) 63 7M 16B
1405/04/06 2,326 2,192 2,326 2,212 (2.08) 75 7M 15B
1405/04/03 2,142 2,142 2,269 2,259 2.54 140 13M 29B
1405/04/01 2,197 2,197 2,259 2,203 (2.69) 118 8M 18B
1405/03/31 2,330 2,264 2,330 2,264 (3.0) 90 7M 17B
1405/03/30 2,469 2,328 2,469 2,334 (2.71) 161 16M 38B
1405/03/27 2,399 2,399 2,399 2,399 (2.99) 60 8M 18B
1405/03/26 2,599 2,449 2,599 2,473 (2.02) 173 14M 34B
1405/03/25 2,524 2,472 2,524 2,524 2.98 269 22M 56B
1405/03/24 2,451 2,450 2,451 2,451 2.98 103 10M 25B
1405/03/23 2,380 2,380 2,380 2,380 2.99 39 3M 7B
1405/03/20 2,335 2,205 2,335 2,311 1.94 194 14M 33B
1405/03/19 2,267 2,240 2,267 2,267 3.00 227 32M 72B
1405/03/18 2,201 2,201 2,201 2,201 (3.0) 39 4M 8B
1405/03/17 2,234 2,190 2,275 2,269 2.72 148 10M 22B
1405/03/16 2,208 2,208 2,238 2,209 (2.94) 183 12M 27B
1405/03/13 2,276 2,276 2,276 2,276 (2.98) 20 3M 6B
1405/03/12 2,349 2,346 2,349 2,346 (2.98) 68 7M 17B
1405/03/11 2,484 2,362 2,484 2,470 2.40 135 10M 24B
1405/03/10 2,412 2,412 2,412 2,412 2.99 83 4M 9B
1405/03/09 2,342 2,342 2,342 2,342 2.99 24 1M 3B
1405/03/06 2,274 2,274 2,274 2,274 2.99 29 1M 3B
1405/03/05 2,274 2,274 2,274 2,274 2.99 29 1M 3B
1405/03/04 2,208 2,207 2,208 2,208 2.99 41 4M 9B
1405/03/03 2,144 2,144 2,144 2,144 2.98 31 814K 2B
1405/03/02 2,144 2,144 2,144 2,144 2.98 14 89K 190M
1404/12/09 2,239 2,117 2,246 2,133 (2.25) 25 1M 2B
1404/12/06 2,177 2,177 2,250 2,182 (2.76) 147 10M 22B
1404/12/05 2,181 2,181 2,292 2,244 (0.18) 80 3M 6B
1404/12/04 2,250 2,245 2,337 2,248 (2.85) 129 9M 20B
1404/12/03 2,314 2,314 2,314 2,314 (2.98) 31 4M 10B
1404/12/02 2,385 2,385 2,385 2,385 (2.97) 60 10M 24B
1404/11/29 2,485 2,385 2,485 2,458 1.86 96 7M 18B
1404/11/28 2,413 2,413 2,413 2,413 2.99 36 4M 9B
1404/11/27 2,343 2,343 2,343 2,343 2.99 25 389K 912M
1404/11/26 2,275 2,274 2,275 2,275 2.99 36 2M 3B
1404/11/25 2,200 2,191 2,325 2,209 (2.17) 132 9M 21B
1404/11/21 2,258 2,258 2,260 2,258 (2.97) 113 11M 25B
1404/11/20 2,327 2,327 2,327 2,327 (2.96) 56 8M 20B
1404/11/19 2,513 2,370 2,513 2,398 (1.84) 66 6M 15B
1404/11/18 2,330 2,330 2,469 2,443 1.88 111 3M 8B
1404/11/14 2,398 2,398 2,400 2,398 (2.99) 43 5M 12B
1404/11/13 2,404 2,390 2,536 2,472 0.37 319 19M 47B
1404/11/12 2,463 2,463 2,463 2,463 (2.99) 66 10M 24B
1404/11/11 2,539 2,539 2,539 2,539 (2.98) 21 3M 8B
1404/11/08 2,617 2,617 2,617 2,617 (2.97) 22 3M 9B
1404/11/07 2,697 2,697 2,697 2,697 (2.99) 21 3M 8B
1404/11/06 2,780 2,780 2,780 2,780 (2.97) 27 5M 15B
1404/11/05 2,865 2,865 2,865 2,865 (2.98) 23 3M 9B
1404/11/04 2,992 2,951 2,992 2,953 (2.93) 29 3M 9B
1404/11/01 3,174 2,991 3,174 3,042 (1.33) 330 19M 59B
1404/10/30 3,082 3,050 3,083 3,083 2.97 525 58M 178B
1404/10/29 2,994 2,909 2,994 2,994 2.99 212 23M 69B
1404/10/28 2,907 2,907 2,907 2,907 2.98 74 4M 12B
1404/10/24 2,701 2,701 2,826 2,823 2.88 522 50M 140B
1404/10/23 2,669 2,669 2,749 2,744 2.81 165 11M 29B
1404/10/22 2,669 2,644 2,669 2,669 2.97 155 10M 26B
1404/10/21 2,547 2,547 2,598 2,592 2.73 174 11M 29B
1404/10/20 2,520 2,400 2,532 2,523 2.60 303 30M 77B
1404/10/17 2,459 2,459 2,459 2,459 2.97 82 5M 13B
1404/10/16 2,455 2,455 2,455 2,388 0.17 129 12M 29B
1404/10/15 2,309 2,309 2,451 2,384 0.17 259 12M 30B
1404/10/14 2,330 2,310 2,330 2,380 (0.04) 85 4M 10B
1404/10/10 2,400 2,309 2,440 2,381 0.04 160 11M 26B
1404/10/09 2,312 2,312 2,312 2,380 (0.13) 104 9M 20B
1404/10/08 2,315 2,315 2,330 2,383 (0.13) 169 9M 21B
1404/10/07 2,361 2,319 2,456 2,386 0.0 206 8M 20B
1404/10/06 2,455 2,401 2,455 2,386 0.08 213 9M 21B
1404/10/03 2,452 2,452 2,452 2,384 0.13 116 8M 19B
1404/10/02 2,448 2,448 2,448 2,381 0.17 123 10M 25B
1404/10/01 2,447 2,447 2,447 2,377 0.04 57 4M 9B
1404/09/26 2,299 2,299 2,440 2,376 0.30 334 26M 62B
1404/09/25 2,299 2,299 2,299 2,369 (0.04) 26 3M 8B
1404/09/24 2,301 2,301 2,301 2,370 (0.08) 54 5M 13B
1404/09/23 2,303 2,303 2,303 2,372 (0.08) 77 6M 13B
1404/09/22 2,305 2,305 2,305 2,374 (0.08) 48 5M 11B
1404/09/19 2,307 2,307 2,307 2,376 (0.08) 51 6M 13B
1404/09/18 2,308 2,308 2,308 2,378 (0.04) 38 4M 9B
1404/09/17 2,312 2,310 2,313 2,379 (0.08) 76 5M 11B
1404/09/16 2,313 2,313 2,369 2,381 (0.13) 139 8M 18B
1404/09/15 2,318 2,318 2,341 2,384 (0.21) 265 15M 35B
1404/09/12 2,338 2,338 2,400 2,389 (0.87) 394 58M 136B
1404/09/11 2,372 2,372 2,372 2,410 (1.43) 352 97M 230B
1404/09/10 2,373 2,373 2,373 2,445 (0.04) 20 3M 7B
1404/09/09 2,326 2,326 2,326 2,446 (0.08) 26 3M 7B
1404/09/08 2,376 2,376 2,376 2,448 (0.04) 20 3M 7B
1404/09/05 2,377 2,377 2,377 2,449 (0.04) 16 3M 7B
1404/09/04 2,378 2,378 2,378 2,450 (0.04) 18 3M 7B
1404/09/02 2,379 2,379 2,379 2,451 (0.04) 17 3M 7B
1404/09/01 2,380 2,380 2,380 2,452 (0.04) 16 3M 7B
1404/08/28 2,333 2,333 2,333 2,453 (0.08) 26 3M 8B
1404/08/27 2,383 2,383 2,383 2,455 (0.04) 16 3M 7B
1404/08/26 2,384 2,384 2,384 2,456 (0.04) 17 3M 7B
1404/08/25 2,385 2,385 2,385 2,457 (0.04) 16 3M 7B
1404/08/24 2,389 2,389 2,389 2,458 (0.16) 60 10M 25B
1404/08/21 2,390 2,390 2,390 2,462 (0.04) 20 3M 7B
1404/08/20 2,346 2,346 2,346 2,463 (0.24) 65 10M 24B
1404/08/19 2,396 2,396 2,396 2,469 (0.04) 14 3M 7B
1404/08/18 2,397 2,397 2,397 2,470 (0.04) 20 3M 7B
1404/08/17 2,399 2,399 2,399 2,471 (0.08) 35 5M 13B
1404/08/14 2,400 2,400 2,400 2,473 (0.04) 14 3M 7B
1404/08/13 2,401 2,401 2,401 2,474 (0.04) 25 3M 8B
1404/08/12 2,475 2,475 2,475 2,475 (2.98) 100 15M 36B
1404/08/11 2,551 2,551 2,551 2,551 (2.97) 23 3M 9B
1404/08/07 2,629 2,629 2,629 2,629 (2.99) 87 7M 19B
1404/08/06 2,710 2,710 2,710 2,710 (2.97) 47 5M 12B
1404/08/05 2,790 2,710 2,803 2,793 2.61 365 21M 58B
1404/08/04 2,790 2,679 2,790 2,722 (1.38) 308 13M 36B
1404/08/03 2,790 2,649 2,810 2,760 1.10 198 11M 30B
1404/07/30 2,730 2,700 2,731 2,730 2.94 399 34M 93B
1404/07/29 2,657 2,593 2,657 2,652 2.79 282 24M 63B
1404/07/28 2,525 2,525 2,588 2,580 2.67 338 29M 75B
1404/07/27 2,459 2,459 2,531 2,513 2.20 245 21M 53B
1404/07/26 2,393 2,393 2,461 2,459 2.89 340 33M 80B
1404/07/23 2,323 2,323 2,392 2,390 2.88 158 15M 37B
1404/07/22 2,335 2,250 2,367 2,323 1.04 137 12M 27B
1404/07/21 2,296 2,296 2,367 2,299 (2.87) 351 65M 149B
1404/07/20 2,438 2,365 2,438 2,367 (2.91) 168 24M 56B
1404/07/19 2,475 2,353 2,475 2,438 1.33 108 7M 18B
1404/07/16 2,452 2,365 2,452 2,406 1.05 103 6M 13B
1404/07/15 2,321 2,315 2,447 2,381 (0.17) 202 13M 31B
1404/07/14 2,345 2,345 2,489 2,385 (1.32) 314 24M 58B
1404/07/13 2,426 2,367 2,497 2,417 (0.37) 129 9M 23B
1404/07/12 2,359 2,359 2,426 2,426 2.97 203 19M 46B
1404/07/09 2,320 2,270 2,381 2,356 1.90 247 15M 35B
1404/07/08 2,406 2,304 2,406 2,312 (2.65) 302 40M 92B
1404/07/07 2,405 2,333 2,405 2,375 1.63 300 33M 78B
1404/07/06 2,337 2,337 2,337 2,337 3.00 86 9M 22B
1404/07/05 2,255 2,252 2,276 2,269 2.67 123 8M 19B
1404/07/02 2,207 2,180 2,210 2,210 2.98 199 18M 40B
1404/07/01 2,157 2,100 2,159 2,146 2.34 112 18M 38B
1404/06/31 2,124 2,090 2,135 2,097 1.16 92 4M 9B
1404/06/30 2,073 2,073 2,100 2,073 (2.99) 210 31M 63B
1404/06/29 2,098 2,098 2,098 2,137 (1.16) 17 4M 8B
1404/06/26 2,125 2,125 2,171 2,162 2.56 239 21M 45B
1404/06/25 2,107 2,105 2,169 2,108 (2.86) 284 35M 75B
1404/06/24 2,190 2,100 2,190 2,170 2.02 542 79M 172B
1404/06/23 2,134 2,134 2,134 2,127 2.65 66 9M 19B
1404/06/22 2,091 2,091 2,091 2,072 2.02 79 7M 14B
1404/06/18 2,032 2,032 2,032 2,031 2.94 94 11M 22B
1404/06/17 2,005 2,005 2,005 1,973 1.34 64 5M 10B
1404/06/16 1,953 1,950 1,953 1,947 2.64 91 10M 19B
1404/06/15 1,854 1,854 1,902 1,897 2.71 119 13M 24B
1404/06/12 1,875 1,851 1,875 1,847 1.43 90 7M 13B
1404/06/11 1,844 1,800 1,845 1,821 1.62 80 6M 11B
1404/06/09 1,760 1,760 1,830 1,792 0.84 116 6M 10B
1404/06/08 1,750 1,750 1,801 1,777 (0.84) 74 6M 10B
1404/06/05 1,834 1,783 1,834 1,792 0.62 118 3M 6B
1404/06/04 1,773 1,773 1,827 1,781 (2.52) 295 29M 51B
1404/06/03 1,823 1,823 1,823 1,827 (2.77) 32 10M 18B
1404/06/01 1,914 1,804 1,914 1,879 1.08 374 36M 68B
1404/05/29 1,876 1,876 1,876 1,859 2.03 63 8M 15B
1404/05/28 1,849 1,807 1,849 1,822 1.45 70 6M 10B
1404/05/27 1,804 1,758 1,806 1,796 2.39 113 10M 18B
1404/05/26 1,775 1,736 1,775 1,754 1.74 71 7M 12B
1404/05/25 1,718 1,680 1,778 1,724 (0.4) 235 10M 17B
1404/05/22 1,736 1,686 1,736 1,731 2.67 248 25M 44B
1404/05/21 1,618 1,618 1,699 1,686 2.18 101 10M 17B
1404/05/20 1,602 1,602 1,680 1,650 0.43 103 4M 7B
1404/05/19 1,660 1,624 1,678 1,643 0.37 81 7M 11B
1404/05/18 1,589 1,588 1,666 1,637 0.0 48 3M 4B
1404/05/15 1,690 1,598 1,690 1,637 (0.61) 44 3M 5B
1404/05/14 1,699 1,615 1,712 1,647 (1.02) 147 8M 14B
1404/05/13 1,615 1,600 1,679 1,664 1.96 221 18M 30B
1404/05/12 1,586 1,586 1,659 1,632 (0.06) 127 4M 7B
1404/05/11 1,597 1,597 1,679 1,633 (0.67) 88 7M 12B
1404/05/08 1,621 1,599 1,689 1,644 (0.24) 149 8M 14B
1404/05/07 1,631 1,625 1,640 1,648 (1.61) 89 7M 11B
1404/05/06 1,684 1,635 1,684 1,675 2.45 207 27M 45B
1404/05/05 1,669 1,669 1,669 1,635 0.86 61 4M 6B
1404/05/04 1,551 1,551 1,637 1,621 1.95 111 8M 14B
1404/05/01 1,595 1,562 1,595 1,590 2.65 113 12M 18B
1404/04/31 1,580 1,580 1,580 1,549 0.98 49 4M 7B
1404/04/30 1,488 1,488 1,579 1,534 0.0 67 4M 6B
1404/04/29 1,503 1,502 1,510 1,534 (0.9) 42 4M 6B
1404/04/28 1,584 1,496 1,585 1,548 0.58 85 3M 5B
1404/04/25 1,501 1,501 1,540 1,539 (0.52) 47 6M 10B
1404/04/24 1,513 1,513 1,558 1,547 (0.77) 70 4M 6B
1404/04/23 1,559 1,559 1,598 1,559 (2.99) 97 15M 23B
1404/04/22 1,585 1,562 1,585 1,607 (0.19) 19 920K 1B
1404/04/21 1,645 1,599 1,646 1,610 0.37 112 5M 8B
1404/04/18 1,604 1,604 1,604 1,604 (2.96) 79 14M 23B
1404/04/17 1,609 1,608 1,609 1,653 (0.24) 14 951K 2B
1404/04/16 1,706 1,610 1,706 1,657 (0.12) 114 5M 8B
1404/04/11 1,621 1,621 1,721 1,659 (0.72) 267 29M 48B
1404/04/10 1,671 1,671 1,671 1,671 (2.96) 291 75M 125B
1404/04/09 1,722 1,722 1,726 1,722 (2.99) 148 34M 59B
1404/03/21 1,730 1,730 1,808 1,775 0.57 214 9M 16B
1404/03/20 1,785 1,739 1,785 1,765 1.55 316 18M 32B
1404/03/19 1,668 1,668 1,738 1,738 2.96 149 13M 22B
1404/03/18 1,740 1,662 1,740 1,688 (1.46) 376 21M 35B
1404/03/17 1,742 1,690 1,784 1,713 (1.66) 310 23M 40B
1404/03/13 1,746 1,746 1,746 1,742 2.71 130 12M 20B
1404/03/12 1,711 1,711 1,711 1,696 2.05 86 9M 15B
1404/03/11 1,596 1,595 1,693 1,662 1.09 514 43M 71B
1404/03/10 1,646 1,600 1,646 1,644 2.81 489 67M 110B
1404/03/07 1,599 1,599 1,599 1,599 2.96 120 21M 34B
1404/03/06 1,585 1,585 1,585 1,553 0.91 66 4M 6B
1404/03/05 1,577 1,577 1,577 1,539 0.46 22 2M 3B
1404/02/31 1,587 1,529 1,587 1,532 (2.79) 377 42M 64B
1404/02/30 1,551 1,510 1,587 1,576 2.27 275 22M 35B
1404/02/29 1,545 1,515 1,545 1,541 2.73 266 33M 51B
1404/02/28 1,532 1,532 1,532 1,500 0.81 53 4M 6B
1404/02/27 1,517 1,517 1,517 1,488 1.02 75 5M 7B
1404/02/24 1,496 1,496 1,496 1,473 1.38 61 7M 10B
1404/02/23 1,474 1,474 1,474 1,453 1.47 68 7M 11B
1404/02/22 1,470 1,470 1,470 1,432 0.28 37 1M 2B
1404/02/21 1,444 1,440 1,444 1,428 1.85 135 9M 13B
1404/02/20 1,385 1,350 1,416 1,402 1.96 225 15M 22B
1404/02/17 1,381 1,360 1,381 1,375 2.54 151 13M 18B
1404/02/16 1,350 1,350 1,360 1,341 1.51 76 8M 11B
1404/02/15 1,339 1,280 1,339 1,321 1.62 157 16M 21B
1404/02/14 1,247 1,247 1,323 1,300 1.17 144 13M 17B
1404/02/13 1,300 1,278 1,341 1,285 (2.43) 196 17M 22B
1404/02/10 1,288 1,288 1,322 1,317 2.57 112 14M 18B
1404/02/09 1,248 1,248 1,285 1,284 2.88 234 34M 44B
1404/02/08 1,279 1,232 1,282 1,248 0.16 97 3M 4B
1404/02/07 1,209 1,209 1,278 1,246 0.08 97 4M 5B
1404/02/06 1,280 1,242 1,280 1,245 0.16 101 4M 5B
1404/02/03 1,210 1,210 1,275 1,243 0.40 156 5M 7B
1404/02/02 1,270 1,211 1,273 1,238 0.16 105 4M 5B
1404/02/01 1,247 1,211 1,247 1,236 2.06 204 12M 15B
1404/01/31 1,220 1,218 1,231 1,211 1.25 140 7M 9B
1404/01/30 1,158 1,158 1,218 1,196 1.10 137 6M 8B
1404/01/27 1,173 1,150 1,210 1,183 (0.17) 99 5M 6B
1404/01/26 1,213 1,170 1,213 1,185 0.59 97 5M 6B
1404/01/25 1,150 1,150 1,204 1,178 0.77 83 4M 5B
1404/01/24 1,184 1,150 1,186 1,169 1.48 139 9M 10B
1404/01/23 1,212 1,145 1,212 1,152 (2.37) 200 14M 17B
1404/01/20 1,180 1,156 1,210 1,180 (0.34) 83 4M 5B
1404/01/19 1,206 1,192 1,206 1,184 1.11 143 6M 8B
1404/01/18 1,155 1,155 1,187 1,171 1.56 207 10M 11B
1404/01/17 1,120 1,120 1,180 1,153 0.61 137 6M 7B
1404/01/16 1,130 1,120 1,186 1,146 (0.69) 118 7M 8B
1404/01/10 1,150 1,136 1,161 1,154 (1.45) 162 9M 10B
1404/01/09 1,150 1,147 1,169 1,171 (0.93) 135 6M 7B
1404/01/06 1,165 1,161 1,195 1,182 (1.17) 155 7M 8B
1404/01/05 1,163 1,163 1,213 1,196 0.0 47 1M 1B
1403/12/28 1,164 1,163 1,216 1,196 (0.17) 14 1M 1B
1403/12/20 1,209 1,173 1,211 1,200 (0.74) 98 5M 6B
1403/12/19 1,209 1,206 1,220 1,209 (2.74) 233 15M 18B
1403/12/18 1,266 1,215 1,266 1,243 (0.72) 123 6M 7B
1403/12/15 1,236 1,227 1,278 1,252 (0.95) 147 8M 10B
1403/12/14 1,235 1,229 1,303 1,264 (0.16) 111 4M 5B
1403/12/13 1,255 1,254 1,277 1,266 (2.01) 168 11M 14B
1403/12/12 1,280 1,265 1,312 1,292 0.16 115 4M 5B
1403/12/11 1,269 1,269 1,305 1,290 0.0 104 6M 7B
1403/12/08 1,271 1,265 1,299 1,290 (0.39) 138 4M 5B
1403/12/07 1,281 1,281 1,321 1,295 0.15 280 14M 18B
1403/12/06 1,263 1,263 1,309 1,293 0.47 222 9M 12B
1403/12/05 1,265 1,262 1,305 1,287 (0.39) 146 5M 7B
1403/12/04 1,269 1,269 1,319 1,292 0.16 144 5M 6B
1403/12/01 1,301 1,260 1,312 1,290 1.26 209 8M 10B
1403/11/30 1,275 1,273 1,290 1,274 (2.9) 286 15M 19B
1403/11/29 1,309 1,309 1,320 1,312 (2.74) 267 14M 18B
1403/11/28 1,315 1,315 1,315 1,349 (0.44) 34 2M 3B
1403/11/27 1,316 1,316 1,316 1,355 (0.07) 7 200K 263M
1403/11/17 1,374 1,361 1,374 1,356 1.65 180 9M 12B
1403/11/16 1,361 1,361 1,361 1,334 0.91 128 5M 7B
1403/11/15 1,347 1,345 1,347 1,322 1.07 123 6M 7B
1403/11/14 1,309 1,286 1,330 1,308 1.24 176 7M 9B
1403/11/13 1,302 1,260 1,302 1,292 (0.46) 195 6M 8B
1403/11/10 1,301 1,292 1,330 1,298 (2.48) 312 16M 20B
1403/11/08 1,324 1,308 1,351 1,331 (1.26) 240 11M 14B
1403/11/07 1,320 1,320 1,376 1,348 (0.3) 245 6M 9B
1403/11/06 1,366 1,346 1,399 1,352 (2.52) 387 14M 19B
1403/11/03 1,380 1,358 1,423 1,387 0.29 192 7M 9B
1403/11/02 1,379 1,376 1,420 1,383 (2.47) 303 12M 17B
1403/11/01 1,410 1,409 1,440 1,418 (2.34) 223 11M 16B
1403/10/30 1,430 1,430 1,476 1,452 (1.49) 151 7M 10B
1403/10/29 1,465 1,447 1,465 1,474 (1.14) 137 5M 8B
1403/10/26 1,489 1,467 1,506 1,491 (1.39) 250 7M 11B
1403/10/24 1,518 1,480 1,528 1,512 (0.79) 193 6M 9B
1403/10/23 1,511 1,502 1,511 1,524 (1.55) 202 7M 10B
1403/10/22 1,584 1,513 1,585 1,548 0.58 275 10M 16B
1403/10/19 1,553 1,520 1,553 1,539 2.06 235 10M 16B
1403/10/18 1,510 1,510 1,522 1,508 2.03 196 9M 14B
1403/10/17 1,480 1,464 1,502 1,478 1.30 214 8M 11B
1403/10/16 1,431 1,421 1,483 1,459 0.48 162 5M 8B
1403/10/15 1,467 1,440 1,470 1,452 1.68 242 11M 16B
1403/10/12 1,431 1,420 1,460 1,428 (2.39) 626 29M 42B
1403/10/11 1,505 1,430 1,506 1,463 (0.61) 183 6M 9B
1403/10/10 1,436 1,436 1,478 1,472 (0.2) 102 3M 4B
1403/10/09 1,495 1,453 1,500 1,475 (0.14) 158 7M 10B
1403/10/08 1,490 1,471 1,495 1,477 1.72 272 8M 12B
1403/10/05 1,451 1,424 1,481 1,452 (1.09) 225 8M 12B
1403/10/04 1,508 1,450 1,508 1,468 0.14 223 9M 14B
1403/10/03 1,440 1,440 1,500 1,466 (0.61) 260 7M 10B
1403/10/02 1,532 1,449 1,532 1,475 (1.21) 192 7M 11B
1403/10/01 1,484 1,484 1,525 1,493 0.61 143 4M 6B
1403/09/28 1,461 1,460 1,540 1,484 (1.4) 312 10M 14B
1403/09/27 1,501 1,499 1,545 1,505 (2.59) 261 12M 17B
1403/09/26 1,615 1,536 1,615 1,545 (2.4) 355 16M 24B
1403/09/25 1,607 1,549 1,640 1,583 (0.63) 402 18M 29B
1403/09/24 1,592 1,571 1,594 1,593 2.91 566 30M 47B
1403/09/21 1,580 1,519 1,594 1,548 (1.09) 236 10M 15B
1403/09/20 1,586 1,539 1,617 1,565 (1.32) 323 14M 22B
1403/09/19 1,612 1,570 1,615 1,586 1.15 468 22M 34B
1403/09/18 1,491 1,491 1,573 1,568 2.62 358 13M 21B
1403/09/17 1,559 1,480 1,564 1,528 0.59 297 15M 22B
1403/09/14 1,447 1,447 1,522 1,519 2.77 661 42M 64B
1403/09/13 1,470 1,454 1,516 1,478 (0.2) 357 20M 30B
1403/09/12 1,430 1,430 1,502 1,481 1.44 292 13M 19B
1403/09/11 1,490 1,441 1,490 1,460 (1.68) 135 8M 11B
1403/09/10 1,481 1,453 1,503 1,485 (0.8) 150 7M 10B
1403/09/07 1,490 1,470 1,529 1,497 (0.6) 186 10M 15B
1403/09/06 1,538 1,450 1,538 1,506 0.80 316 18M 27B
1403/09/05 1,502 1,475 1,508 1,494 1.98 507 40M 60B
1403/09/04 1,421 1,420 1,484 1,465 1.67 292 11M 17B
1403/09/03 1,456 1,412 1,465 1,441 (0.07) 86 3M 4B
1403/08/30 1,419 1,419 1,456 1,442 (1.37) 159 7M 10B
1403/08/29 1,470 1,403 1,489 1,462 1.11 198 10M 14B
1403/08/28 1,460 1,405 1,467 1,446 1.47 282 12M 18B
1403/08/27 1,404 1,404 1,466 1,425 0.07 113 4M 5B
1403/08/26 1,380 1,380 1,451 1,424 1.06 132 6M 8B
1403/08/23 1,363 1,363 1,446 1,409 0.28 111 3M 5B
1403/08/22 1,411 1,369 1,415 1,405 (0.43) 68 3M 4B
1403/08/21 1,402 1,360 1,439 1,411 0.93 123 5M 8B
1403/08/20 1,353 1,353 1,425 1,398 0.29 105 4M 5B
1403/08/19 1,387 1,387 1,428 1,394 (2.45) 209 12M 17B
1403/08/16 1,388 1,388 1,388 1,429 (0.07) 7 188K 261M
1403/08/15 1,392 1,392 1,392 1,430 (0.35) 28 2M 2B
1403/08/06 1,412 1,412 1,466 1,435 0.77 92 4M 6B
1403/08/05 1,374 1,374 1,457 1,424 0.64 77 4M 5B
1403/08/02 1,374 1,374 1,374 1,415 (0.07) 14 190K 261M
1403/08/01 1,380 1,378 1,390 1,416 (0.28) 30 1M 2B
1403/07/30 1,384 1,384 1,418 1,420 (0.42) 60 2M 3B
1403/07/29 1,389 1,389 1,400 1,426 (0.35) 41 2M 2B
1403/07/28 1,399 1,399 1,399 1,431 (0.76) 62 4M 5B
1403/07/25 1,405 1,405 1,445 1,442 (0.41) 38 2M 3B
1403/07/24 1,480 1,410 1,480 1,448 (0.14) 27 837K 1B
1403/07/23 1,450 1,420 1,474 1,450 (0.21) 95 5M 7B
1403/07/22 1,400 1,400 1,481 1,453 1.04 133 6M 9B
1403/07/21 1,410 1,399 1,450 1,438 (0.28) 60 3M 5B
1403/07/18 1,432 1,430 1,433 1,442 (0.14) 45 2M 4B
1403/07/17 1,431 1,431 1,450 1,444 (0.07) 36 2M 2B
1403/07/16 1,448 1,433 1,450 1,445 (0.14) 59 2M 3B
1403/07/15 1,438 1,436 1,455 1,447 (0.21) 64 3M 4B
1403/07/14 1,440 1,439 1,458 1,450 (0.21) 73 3M 5B
1403/07/11 1,435 1,435 1,463 1,453 0.28 96 4M 6B
1403/07/10 1,440 1,440 1,461 1,449 0.14 51 2M 3B
1403/07/07 1,434 1,434 1,462 1,447 (0.07) 87 4M 6B
1403/07/04 1,481 1,435 1,481 1,448 0.70 87 5M 7B
1403/07/03 1,410 1,403 1,456 1,438 1.70 156 10M 14B
1403/07/02 1,400 1,400 1,453 1,414 0.21 69 2M 3B
1403/07/01 1,425 1,409 1,449 1,411 0.21 42 2M 3B
1403/06/28 1,404 1,390 1,437 1,408 0.86 107 5M 7B
1403/06/27 1,349 1,349 1,430 1,396 0.50 68 3M 5B
1403/06/26 1,384 1,368 1,423 1,389 0.07 48 2M 2B
1403/06/25 1,380 1,380 1,429 1,388 0.0 58 1M 2B
1403/06/24 1,424 1,381 1,424 1,388 0.36 45 2M 3B
1403/06/21 1,360 1,360 1,412 1,383 0.88 93 4M 6B
1403/06/20 1,361 1,361 1,410 1,371 0.07 25 626K 868M
1403/06/19 1,390 1,339 1,391 1,370 1.41 138 9M 12B
1403/06/18 1,301 1,301 1,381 1,351 0.75 85 4M 6B
1403/06/17 1,370 1,331 1,370 1,341 0.75 72 4M 6B
1403/06/13 1,354 1,354 1,354 1,331 0.23 34 2M 3B
1403/06/03 1,330 1,300 1,352 1,328 0.15 76 2M 3B
1403/05/31 1,303 1,301 1,319 1,326 (0.08) 23 478K 622M
1403/05/30 1,328 1,303 1,328 1,327 (0.15) 30 1M 2B
1403/05/29 1,313 1,308 1,313 1,329 (0.37) 50 3M 4B
1403/05/28 1,320 1,313 1,320 1,334 (0.07) 22 671K 884M
1403/05/27 1,310 1,310 1,349 1,335 (0.07) 36 929K 1B
1403/05/24 1,326 1,326 1,326 1,336 (0.22) 67 4M 5B
1403/05/22 1,327 1,327 1,328 1,339 (0.07) 21 788K 1B
1403/05/21 1,353 1,328 1,353 1,340 (0.07) 30 1M 1B
1403/05/20 1,354 1,328 1,354 1,341 0.0 28 474K 630M
1403/05/16 1,329 1,329 1,329 1,341 (0.07) 16 783K 1B
1403/05/15 1,340 1,329 1,354 1,342 0.0 16 898K 1B
1403/05/14 1,330 1,330 1,340 1,342 (0.07) 31 1M 2B
1403/05/13 1,345 1,343 1,350 1,343 (2.96) 189 15M 20B
1403/05/10 1,374 1,374 1,385 1,384 (2.26) 144 11M 15B
1403/05/09 1,378 1,378 1,400 1,416 (0.28) 32 2M 2B
1403/05/08 1,426 1,384 1,426 1,420 (0.42) 46 2M 3B
1403/05/06 1,390 1,390 1,469 1,426 (0.28) 43 2M 3B
1403/05/03 1,399 1,391 1,401 1,430 (0.14) 39 892K 1B
1403/05/02 1,393 1,393 1,458 1,432 0.0 51 732K 1B
1403/05/01 1,392 1,392 1,424 1,432 (0.14) 20 791K 1B
1403/04/31 1,417 1,398 1,417 1,434 (0.49) 58 2M 3B
1403/04/30 1,417 1,417 1,450 1,441 (1.3) 99 7M 9B
1403/04/27 1,426 1,424 1,456 1,460 (0.54) 67 3M 4B
1403/04/24 1,425 1,425 1,468 1,468 (0.07) 29 573K 823M
1403/04/23 1,432 1,431 1,468 1,469 (0.41) 36 2M 3B
1403/04/20 1,440 1,439 1,500 1,475 (0.54) 60 3M 4B
1403/04/19 1,450 1,448 1,468 1,483 (0.6) 79 3M 4B
1403/04/18 1,461 1,454 1,489 1,492 (0.33) 55 2M 3B
1403/04/17 1,508 1,462 1,535 1,497 0.40 90 3M 5B
1403/04/16 1,508 1,490 1,508 1,491 1.77 179 8M 12B
1403/04/13 1,427 1,427 1,460 1,465 (0.2) 82 2M 3B
1403/04/12 1,433 1,433 1,458 1,468 (0.61) 104 3M 4B
1403/04/11 1,450 1,449 1,493 1,477 (1.07) 129 5M 8B
1403/04/10 1,491 1,488 1,520 1,493 (2.67) 196 12M 18B
1403/04/09 1,504 1,504 1,556 1,534 (0.32) 127 5M 8B
1403/04/06 1,521 1,521 1,539 1,539 (0.84) 135 6M 9B
1403/04/04 1,534 1,534 1,534 1,552 (0.83) 114 5M 8B
1403/04/03 1,535 1,535 1,535 1,565 (0.06) 4 272K 417M
1403/04/02 1,535 1,535 1,535 1,566 0.0 2 200K 307M
1403/03/27 1,535 1,535 1,535 1,566 0.0 2 33K 51M
1403/03/26 1,535 1,535 1,535 1,566 0.0 2 157K 242M
1403/03/23 1,535 1,535 1,535 1,566 0.0 1 36K 54M
1403/03/22 1,535 1,535 1,535 1,566 0.0 4 102K 156M
1403/03/21 1,536 1,536 1,536 1,566 (0.06) 9 353K 542M
1403/03/20 1,536 1,536 1,536 1,567 0.0 5 183K 282M
1403/03/16 1,537 1,537 1,537 1,567 (0.06) 5 416K 639M
1403/03/12 1,537 1,537 1,537 1,568 0.0 6 166K 255M
1403/03/09 1,538 1,538 1,538 1,568 (0.06) 15 503K 774M
1403/03/08 1,539 1,539 1,539 1,569 (0.06) 11 471K 724M
1403/03/07 1,540 1,540 1,540 1,570 (0.06) 7 306K 471M
1403/03/06 1,540 1,540 1,540 1,571 0.0 5 152K 234M
1403/02/30 1,527 1,527 1,527 1,571 (0.19) 20 728K 1B
1403/02/17 1,549 1,545 1,590 1,574 (1.13) 151 6M 9B
1403/02/16 1,562 1,550 1,619 1,592 (0.19) 87 3M 5B
1403/02/12 1,555 1,555 1,609 1,595 0.0 36 683K 1B
1403/02/11 1,596 1,593 1,616 1,595 (2.86) 264 12M 20B
1403/02/10 1,599 1,599 1,645 1,642 (0.3) 81 2M 3B
1403/02/09 1,632 1,620 1,640 1,647 (1.38) 138 6M 9B
1403/02/08 1,630 1,630 1,670 1,670 (0.24) 101 3M 4B
1403/02/05 1,680 1,649 1,682 1,674 (1.53) 188 7M 12B
1403/02/04 1,710 1,663 1,727 1,700 (0.35) 124 4M 7B
1403/02/03 1,670 1,670 1,748 1,706 0.47 162 5M 9B
1403/02/02 1,721 1,666 1,721 1,698 1.62 290 9M 15B
1403/02/01 1,664 1,664 1,717 1,671 (2.57) 268 12M 20B
1403/01/29 1,700 1,700 1,700 1,715 (0.12) 18 1M 3B
1403/01/28 1,701 1,701 1,701 1,717 (0.06) 18 480K 817M
1403/01/27 1,714 1,714 1,730 1,718 (0.75) 210 9M 16B
1403/01/26 1,714 1,714 1,714 1,731 0.0 5 169K 290M
1403/01/25 1,684 1,681 1,684 1,731 (0.06) 16 333K 560M
1403/01/21 1,688 1,688 1,720 1,732 (0.46) 94 2M 4B
1403/01/20 1,696 1,696 1,741 1,740 2.90 302 16M 29B
1403/01/19 1,690 1,689 1,732 1,691 (2.87) 303 15M 25B
1403/01/18 1,756 1,656 1,756 1,741 2.11 560 25M 43B
1403/01/15 1,739 1,739 1,739 1,705 0.95 112 4M 7B
1403/01/14 1,689 1,687 1,689 1,689 2.99 282 18M 31B
1403/01/11 1,672 1,650 1,679 1,640 0.55 93 3M 4B
1403/01/08 1,640 1,627 1,649 1,631 1.87 188 8M 14B
1403/01/07 1,590 1,590 1,633 1,601 0.95 145 4M 7B
1403/01/06 1,590 1,580 1,620 1,586 0.83 125 4M 7B
1403/01/05 1,610 1,585 1,610 1,573 0.58 97 3M 5B
1402/12/28 1,588 1,550 1,598 1,564 0.77 106 4M 6B
1402/12/27 1,503 1,503 1,590 1,552 0.52 120 3M 5B
1402/12/26 1,546 1,525 1,563 1,544 (1.78) 212 10M 15B
1402/12/23 1,592 1,544 1,592 1,572 (0.38) 96 4M 6B
1402/12/22 1,554 1,546 1,610 1,578 (0.38) 153 7M 11B
1402/12/21 1,552 1,552 1,600 1,584 (0.56) 157 7M 11B
1402/12/20 1,584 1,552 1,584 1,593 (0.25) 37 1M 2B
1402/12/16 1,581 1,572 1,623 1,597 (0.13) 86 3M 4B
1402/12/15 1,590 1,590 1,620 1,599 0.19 131 4M 6B
1402/12/14 1,600 1,580 1,626 1,596 1.08 200 6M 10B
1402/12/13 1,595 1,585 1,620 1,579 0.38 60 2M 3B
1402/12/12 1,530 1,530 1,604 1,573 0.96 212 7M 10B
1402/12/09 1,522 1,522 1,590 1,558 (0.13) 112 2M 4B
1402/12/08 1,532 1,523 1,548 1,560 (0.64) 89 3M 5B
1402/12/07 1,550 1,534 1,561 1,570 (0.63) 76 3M 5B
1402/12/05 1,580 1,580 1,601 1,580 0.13 103 3M 4B
1402/12/02 1,558 1,547 1,614 1,578 0.57 144 4M 7B
1402/12/01 1,560 1,558 1,572 1,569 (0.06) 46 2M 3B
1402/11/30 1,563 1,562 1,600 1,570 0.13 70 3M 4B
1402/11/29 1,557 1,550 1,603 1,568 0.0 100 4M 6B
1402/11/28 1,550 1,550 1,610 1,568 (1.75) 236 12M 19B
1402/11/25 1,618 1,576 1,618 1,596 (1.72) 220 9M 14B
1402/11/24 1,606 1,588 1,636 1,624 (0.67) 131 5M 7B
1402/11/23 1,600 1,600 1,636 1,635 (0.37) 98 3M 4B
1402/11/21 1,639 1,615 1,642 1,641 (0.12) 77 2M 3B
1402/11/18 1,600 1,600 1,648 1,643 (0.24) 94 2M 3B
1402/11/17 1,650 1,631 1,678 1,647 (2.02) 166 8M 14B
1402/11/16 1,651 1,645 1,694 1,681 (0.83) 94 4M 6B
1402/11/15 1,690 1,662 1,690 1,695 (1.05) 113 4M 7B
1402/11/14 1,683 1,674 1,740 1,713 (0.7) 193 6M 11B
1402/11/11 1,662 1,662 1,754 1,725 1.23 264 9M 16B
1402/11/10 1,700 1,630 1,710 1,704 2.59 412 20M 34B
1402/11/09 1,590 1,590 1,673 1,661 2.22 224 10M 16B
1402/11/08 1,615 1,600 1,656 1,625 1.06 221 6M 9B
1402/11/07 1,563 1,563 1,648 1,608 0.12 154 3M 5B
1402/11/04 1,591 1,588 1,620 1,606 (1.89) 225 8M 13B
1402/11/03 1,641 1,625 1,665 1,637 (2.27) 229 9M 15B
1402/11/02 1,655 1,654 1,709 1,675 (0.95) 200 6M 10B
1402/11/01 1,663 1,660 1,705 1,691 (0.47) 136 3M 5B
1402/10/30 1,701 1,669 1,720 1,699 (0.82) 173 5M 9B
1402/10/27 1,698 1,698 1,739 1,713 (0.87) 216 10M 17B
1402/10/26 1,692 1,691 1,765 1,728 0.06 284 11M 19B
1402/10/25 1,708 1,704 1,747 1,727 (0.29) 119 3M 5B
1402/10/24 1,713 1,712 1,765 1,732 0.06 147 5M 9B
1402/10/23 1,704 1,704 1,755 1,731 0.0 135 4M 6B
1402/10/20 1,705 1,705 1,762 1,731 0.41 206 7M 13B
1402/10/19 1,715 1,711 1,730 1,724 (0.35) 120 5M 8B
1402/10/18 1,730 1,714 1,750 1,730 0.0 129 3M 6B
1402/10/17 1,745 1,715 1,768 1,730 0.35 134 4M 6B
1402/10/16 1,701 1,700 1,745 1,724 (0.63) 187 6M 11B
1402/10/13 1,701 1,701 1,755 1,735 (0.06) 88 2M 3B
1402/10/12 1,740 1,700 1,790 1,736 (0.52) 155 4M 7B
1402/10/11 1,735 1,719 1,781 1,745 (0.85) 204 5M 9B
1402/10/10 1,810 1,727 1,810 1,760 (0.06) 255 7M 13B
1402/10/09 1,704 1,701 1,763 1,761 2.86 583 30M 53B
1402/10/06 1,692 1,692 1,736 1,712 0.0 111 3M 5B
1402/10/05 1,700 1,693 1,729 1,712 (0.35) 135 4M 7B
1402/10/04 1,703 1,699 1,750 1,718 (0.29) 133 5M 9B
1402/10/03 1,717 1,697 1,760 1,723 (0.46) 178 6M 10B
1402/10/02 1,712 1,702 1,770 1,731 0.41 166 7M 11B
1402/09/29 1,697 1,697 1,776 1,724 (0.81) 232 8M 14B
1402/09/28 1,713 1,709 1,740 1,738 (1.25) 235 7M 12B
1402/09/27 1,751 1,741 1,774 1,760 2.15 290 10M 17B
1402/09/25 1,690 1,681 1,748 1,723 1.47 249 9M 15B
1402/09/22 1,726 1,692 1,726 1,698 (0.12) 205 7M 12B
1402/09/21 1,693 1,680 1,728 1,700 0.0 164 6M 11B
1402/09/20 1,696 1,694 1,715 1,700 (0.47) 365 12M 21B
1402/09/19 1,702 1,694 1,724 1,708 (0.81) 204 8M 13B
1402/09/18 1,722 1,702 1,738 1,722 (0.46) 176 6M 10B
1402/09/15 1,730 1,702 1,756 1,730 (0.86) 196 7M 12B
1402/09/14 1,722 1,722 1,771 1,745 0.06 186 6M 10B
1402/09/13 1,719 1,719 1,790 1,744 (0.06) 190 6M 11B
1402/09/12 1,714 1,714 1,788 1,745 0.40 204 7M 12B
1402/09/11 1,698 1,698 1,741 1,738 2.78 305 12M 21B
1402/09/08 1,634 1,634 1,714 1,691 1.56 224 7M 12B
1402/09/07 1,640 1,632 1,690 1,665 (0.18) 123 3M 5B
1402/09/06 1,668 1,644 1,690 1,668 (0.66) 211 8M 13B
1402/09/05 1,650 1,641 1,710 1,679 (0.47) 136 4M 6B
1402/09/04 1,682 1,670 1,733 1,687 (0.18) 152 5M 8B
1402/09/01 1,691 1,675 1,712 1,690 0.12 176 7M 11B
1402/08/30 1,676 1,655 1,729 1,688 (0.12) 224 10M 16B
1402/08/29 1,683 1,679 1,733 1,690 (0.88) 231 10M 16B
1402/08/28 1,685 1,683 1,746 1,705 0.0 284 10M 17B
1402/08/27 1,687 1,687 1,738 1,705 (0.35) 163 6M 10B
1402/08/24 1,687 1,687 1,734 1,711 (0.06) 145 5M 9B
1402/08/23 1,704 1,689 1,727 1,712 (0.81) 190 8M 14B
1402/08/22 1,720 1,711 1,747 1,726 (0.23) 217 10M 18B
1402/08/21 1,695 1,695 1,750 1,730 (0.29) 164 5M 8B
1402/08/20 1,775 1,710 1,790 1,735 (0.34) 165 6M 11B
1402/08/17 1,789 1,740 1,789 1,741 0.17 90 3M 5B
1402/08/16 1,694 1,694 1,764 1,738 1.46 210 11M 19B
1402/08/15 1,700 1,700 1,736 1,713 0.06 172 6M 11B
1402/08/14 1,691 1,691 1,739 1,712 0.06 105 3M 6B
1402/08/13 1,712 1,676 1,755 1,711 0.0 133 5M 9B
1402/08/10 1,760 1,710 1,760 1,711 (2.89) 250 12M 21B
1402/08/09 1,742 1,742 1,795 1,762 1.09 138 6M 10B
1402/08/08 1,775 1,731 1,775 1,743 1.10 128 5M 8B
1402/08/07 1,701 1,699 1,754 1,724 1.23 157 5M 9B
1402/08/06 1,710 1,702 1,711 1,703 (2.91) 324 16M 27B
1402/08/03 1,763 1,711 1,768 1,754 (0.51) 135 4M 6B
1402/08/02 1,740 1,732 1,794 1,763 (0.96) 171 6M 10B
1402/08/01 1,770 1,760 1,800 1,780 1.19 136 4M 7B
1402/07/30 1,783 1,735 1,810 1,759 (1.35) 182 8M 13B
1402/07/29 1,773 1,740 1,798 1,783 2.12 229 9M 16B
1402/07/26 1,755 1,734 1,811 1,746 (2.29) 298 18M 31B
1402/07/25 1,782 1,775 1,823 1,787 (0.06) 167 9M 16B
1402/07/24 1,772 1,753 1,818 1,788 0.90 142 5M 10B
1402/07/23 1,751 1,746 1,820 1,772 (1.17) 156 5M 9B
1402/07/22 1,795 1,791 1,861 1,793 (2.87) 352 18M 32B
1402/07/19 1,862 1,840 1,900 1,846 (2.64) 291 15M 29B
1402/07/18 1,830 1,830 1,939 1,896 0.58 205 11M 20B
1402/07/17 1,881 1,880 1,935 1,885 (2.73) 217 12M 22B
1402/07/16 1,940 1,938 1,942 1,938 (2.95) 184 9M 17B
1402/07/15 2,070 1,961 2,070 1,997 (0.7) 252 12M 23B
1402/07/12 1,930 1,930 2,011 2,011 2.97 219 7M 14B
1402/07/10 1,930 1,920 2,019 1,953 (1.31) 404 18M 35B
1402/07/09 2,000 1,965 2,040 1,979 (2.27) 246 9M 18B
1402/07/08 2,137 2,016 2,137 2,025 (2.55) 349 15M 31B
1402/07/05 2,092 2,048 2,131 2,078 (1.56) 233 5M 11B
1402/07/04 2,091 2,081 2,167 2,111 (0.75) 211 5M 11B
1402/07/03 2,105 2,094 2,148 2,127 (0.61) 211 5M 11B
1402/07/01 2,144 2,132 2,241 2,140 (2.59) 395 16M 35B
1402/06/29 2,161 2,120 2,235 2,197 0.83 250 8M 18B
1402/06/28 2,101 2,070 2,185 2,179 2.69 430 15M 33B
1402/06/27 2,143 2,120 2,148 2,122 (2.88) 415 16M 34B
1402/06/26 2,172 2,145 2,216 2,185 (1.13) 287 9M 19B
1402/06/22 2,239 2,170 2,240 2,210 1.24 317 10M 23B
1402/06/21 2,104 2,104 2,196 2,183 2.34 463 16M 36B
1402/06/20 2,212 2,103 2,214 2,133 (1.43) 743 26M 54B
1402/06/19 2,150 2,132 2,167 2,164 2.85 613 24M 52B
1402/06/18 2,060 2,030 2,132 2,104 1.64 615 21M 44B
1402/06/14 2,139 2,025 2,139 2,070 (0.81) 693 28M 59B
1402/06/13 2,087 2,087 2,087 2,087 2.96 242 15M 30B
1402/06/12 2,027 2,027 2,027 2,027 3.00 187 13M 26B
1402/06/11 1,968 1,967 1,968 1,968 2.98 264 17M 34B
1402/06/08 1,910 1,863 1,913 1,911 2.85 383 16M 31B
1402/06/07 1,777 1,777 1,860 1,858 2.88 371 22M 40B
1402/06/06 1,780 1,779 1,839 1,806 (0.22) 140 3M 6B
1402/06/05 1,771 1,771 1,821 1,810 2.38 202 9M 16B
1402/06/04 1,711 1,711 1,771 1,768 2.79 226 11M 20B
1402/06/01 1,658 1,651 1,749 1,720 1.24 244 10M 16B
1402/05/31 1,702 1,694 1,730 1,699 (2.69) 165 7M 12B
1402/05/30 1,800 1,725 1,803 1,746 (1.8) 142 5M 9B
1402/05/29 1,780 1,768 1,809 1,778 (2.41) 176 6M 10B
1402/05/28 1,867 1,762 1,869 1,822 0.39 219 6M 11B
1402/05/25 1,723 1,723 1,820 1,815 2.72 361 14M 26B
1402/05/24 1,769 1,763 1,799 1,767 (2.75) 294 12M 21B
1402/05/23 1,841 1,810 1,899 1,817 (2.57) 384 18M 33B
1402/05/22 1,840 1,840 1,910 1,865 (1.37) 185 6M 11B
1402/05/21 1,903 1,888 1,999 1,891 (2.83) 251 11M 21B
1402/05/18 1,971 1,933 1,978 1,946 (2.31) 98 5M 9B
1402/05/15 2,025 1,960 2,039 1,992 0.15 219 5M 9B
1402/05/14 1,895 1,895 1,990 1,989 2.90 344 11M 21B
1402/05/10 1,987 1,907 1,987 1,933 (0.92) 204 6M 11B
1402/05/09 1,964 1,930 1,980 1,951 (0.66) 166 5M 11B
1402/05/08 1,967 1,963 1,994 1,964 (2.92) 726 14M 27B
1402/05/07 2,089 2,010 2,089 2,023 (2.36) 226 6M 13B
1402/05/04 2,144 2,043 2,153 2,072 (1.61) 372 19M 39B
1402/05/03 2,124 2,030 2,127 2,106 1.94 262 12M 25B
1402/05/02 2,053 2,049 2,067 2,066 2.94 388 18M 38B
1402/05/01 1,985 1,901 2,012 2,007 2.71 444 20M 40B
1402/04/31 1,948 1,948 1,993 1,954 (2.69) 248 7M 14B
1402/04/28 1,999 1,958 2,078 2,008 (0.5) 388 10M 21B
1402/04/27 1,948 1,948 2,045 2,018 1.61 358 12M 25B
1402/04/26 1,983 1,983 2,030 1,986 (2.84) 92 3M 6B
1402/04/25 2,070 2,043 2,100 2,044 (2.94) 508 17M 35B
1402/04/24 2,095 2,091 2,195 2,106 (2.27) 569 18M 38B
1402/04/21 2,275 2,153 2,275 2,155 (2.88) 549 17M 37B
1402/04/20 2,230 2,210 2,290 2,219 (2.59) 391 13M 30B
1402/04/19 2,209 2,209 2,300 2,278 0.22 195 4M 10B
1402/04/18 2,250 2,246 2,280 2,273 2.66 728 21M 48B
1402/04/17 2,181 2,178 2,275 2,214 (0.49) 165 5M 10B
1402/04/13 2,134 2,134 2,227 2,225 2.87 742 22M 49B
1402/04/12 2,105 2,105 2,200 2,163 0.79 483 11M 24B
1402/04/11 2,191 2,125 2,215 2,146 (2.01) 296 8M 18B
1402/04/10 2,171 2,167 2,269 2,190 (1.97) 474 13M 27B
1402/04/07 2,246 2,232 2,297 2,234 (2.91) 426 12M 27B
1402/04/06 2,231 2,231 2,315 2,301 2.36 654 18M 41B
1402/04/05 2,265 2,210 2,265 2,248 2.18 90 2M 5B
1402/04/03 2,285 2,197 2,285 2,200 (2.83) 454 13M 28B
1402/03/31 2,260 2,225 2,299 2,264 (1.22) 596 16M 36B
1402/03/30 2,347 2,242 2,347 2,292 0.22 347 7M 16B
1402/03/29 2,288 2,242 2,288 2,287 2.93 794 22M 51B
1402/03/28 2,204 2,198 2,300 2,222 (1.9) 906 26M 57B
1402/03/27 2,264 2,264 2,268 2,265 (2.91) 35 1M 3B
1402/03/17 2,320 2,320 2,360 2,333 (1.27) 434 11M 27B
1402/03/16 2,310 2,310 2,373 2,363 2.56 629 16M 37B
1402/03/13 2,201 2,201 2,328 2,304 1.90 491 13M 30B
1402/03/10 2,319 2,251 2,319 2,261 (2.54) 361 10M 22B
1402/03/09 2,319 2,263 2,327 2,320 2.65 539 14M 33B
1402/03/08 2,161 2,161 2,283 2,260 1.94 850 25M 57B
1402/03/07 2,237 2,208 2,295 2,217 (2.59) 768 25M 56B
1402/03/06 2,330 2,272 2,330 2,276 (2.82) 805 24M 54B
1402/03/03 2,364 2,330 2,410 2,342 (2.5) 974 28M 66B
1402/03/02 2,479 2,366 2,479 2,402 (1.44) 1,090 28M 67B
1402/03/01 2,441 2,376 2,441 2,437 2.83 938 26M 62B
1402/02/31 2,350 2,280 2,374 2,370 2.82 698 23M 55B
1402/02/30 2,308 2,260 2,308 2,305 2.86 1,063 33M 77B
1402/02/27 2,297 2,231 2,297 2,241 (2.52) 1,133 32M 72B
1402/02/25 2,413 2,273 2,413 2,299 (1.88) 1,057 28M 66B
1402/02/24 2,340 2,340 2,400 2,343 (2.86) 1,766 51M 120B
1402/02/23 2,412 2,412 2,412 2,412 (2.98) 365 13M 33B
1402/02/20 2,465 2,462 2,584 2,486 (2.05) 930 29M 73B
1402/02/19 2,538 2,538 2,538 2,538 (2.98) 463 18M 45B
1402/02/18 2,616 2,616 2,616 2,616 (2.97) 278 13M 33B
1402/02/17 2,800 2,689 2,800 2,696 (2.74) 638 22M 58B
1402/02/16 2,774 2,694 2,774 2,772 2.90 1,634 47M 130B
1402/02/13 2,694 2,694 2,694 2,694 2.98 208 3M 8B
1402/02/12 2,616 2,616 2,616 2,616 2.99 314 7M 18B
1402/02/11 2,589 2,439 2,589 2,540 1.03 2,818 80M 204B
1402/02/10 2,515 2,471 2,515 2,514 2.95 2,701 89M 224B
1402/02/09 2,442 2,442 2,442 2,442 2.99 282 7M 18B
1402/02/06 2,371 2,371 2,371 2,371 3.00 162 2M 5B
1402/02/05 2,302 2,302 2,302 2,302 3.00 135 2M 5B
1402/02/04 2,256 2,256 2,256 2,235 2.01 237 6M 14B
1402/01/30 2,225 2,225 2,225 2,191 1.39 216 5M 11B
1402/01/29 2,204 2,204 2,204 2,161 0.98 194 3M 7B
1402/01/28 2,140 2,140 2,140 2,140 2.98 353 11M 23B
1402/01/27 2,078 2,041 2,078 2,078 2.97 677 21M 43B
1402/01/26 2,035 2,035 2,035 2,018 2.13 308 7M 15B
1402/01/22 1,923 1,923 1,977 1,976 2.92 661 22M 43B
1402/01/21 1,923 1,879 1,923 1,920 2.84 1,282 47M 90B
1402/01/20 1,879 1,813 1,905 1,867 0.92 1,744 50M 92B
1402/01/19 1,791 1,783 1,878 1,850 1.20 1,680 52M 96B
1402/01/16 1,868 1,800 1,868 1,828 0.49 1,270 33M 60B
1402/01/15 1,824 1,770 1,824 1,819 2.71 2,144 72M 131B
1402/01/14 1,750 1,715 1,777 1,771 2.61 1,492 47M 83B
1402/01/09 1,689 1,689 1,735 1,726 2.43 2,282 65M 113B
1402/01/08 1,670 1,652 1,720 1,685 (7.11) 1,349 47M 80B
1401/12/24 1,810 1,779 1,861 1,814 0.11 290 5M 9B
1401/12/23 1,805 1,803 1,850 1,812 (2.48) 510 9M 16B
1401/12/22 1,842 1,836 1,884 1,858 (1.8) 416 6M 12B
1401/12/21 1,883 1,882 1,939 1,892 (2.47) 429 9M 16B
1401/12/20 1,940 1,940 1,960 1,940 (2.95) 837 20M 38B
1401/12/16 1,999 1,999 2,018 1,999 (2.96) 1,008 25M 51B
1401/12/15 2,100 2,037 2,120 2,060 106.00 416 13M 26B
🔥 آخرین اخبار