دوشنبه 30 شهریور 1405

جدول آخرین قیمت و نمودار

کارخانجات تولیدی نیروترانسفو

نیروترانسفو(ریال)

تاریخ اولین کمترین بیشترین پایانی درصد تعداد حجم ارزش
1405/06/29 27,750 27,750 27,750 27,750 (2.97) 233 3M 95B
1405/06/28 28,600 28,600 28,600 28,600 (2.99) 369 3M 85B
1405/06/25 30,140 28,400 30,140 29,480 0.72 3,144 19M 561B
1405/06/24 29,270 29,270 29,270 29,270 2.99 989 13M 375B
1405/06/23 28,420 28,420 28,420 28,420 2.97 1,202 12M 353B
1405/06/22 27,600 27,600 27,600 27,600 2.99 1,427 16M 444B
1405/06/21 26,810 26,400 26,810 26,800 2.96 2,325 27M 712B
1405/06/18 26,040 25,500 26,040 26,030 2.93 2,919 24M 622B
1405/06/17 25,290 25,290 25,290 25,290 2.97 1,445 4M 94B
1405/06/16 24,540 24,010 24,570 24,560 2.93 1,991 9M 215B
1405/06/15 23,950 22,620 23,980 23,860 2.45 4,189 28M 662B
1405/06/14 22,240 22,240 23,600 23,290 1.61 5,921 18M 429B
1405/06/11 22,920 22,920 22,920 22,920 (2.96) 792 4M 89B
1405/06/10 23,340 23,340 24,480 23,620 (1.83) 5,690 14M 328B
1405/06/09 24,300 24,050 24,310 24,060 (2.94) 820 5M 125B
1405/06/08 25,280 24,450 25,280 24,790 0.81 9,128 8M 188B
1405/06/07 25,280 24,450 25,280 24,790 0.81 9,128 8M 188B
1405/06/04 25,500 24,250 25,500 24,590 (1.44) 12,384 15M 367B
1405/06/03 24,980 24,790 26,000 24,950 (2.35) 8,853 15M 386B
1405/06/02 25,000 24,980 25,860 25,550 1.75 5,462 14M 346B
1405/06/01 25,100 25,100 25,600 25,110 (2.94) 10,199 68M 2T
1405/05/31 27,230 25,660 27,230 25,870 (2.19) 7,017 17M 430B
1405/05/28 27,500 26,350 27,510 26,450 (2.61) 12,309 24M 642B
1405/05/27 27,260 26,010 27,260 27,160 2.61 7,179 32M 880B
1405/05/26 26,470 26,450 26,470 26,470 3.00 3,151 17M 449B
1405/05/25 25,740 25,030 25,760 25,700 2.76 2,887 13M 328B
1405/05/24 25,370 23,950 25,380 25,010 1.46 5,067 14M 349B
1405/05/21 24,750 24,040 24,750 24,650 2.58 5,120 17M 426B
1405/05/20 24,750 24,040 24,750 24,650 2.58 5,120 17M 426B
1405/05/19 22,850 22,850 24,200 24,030 2.26 4,218 14M 328B
1405/05/18 24,670 23,250 24,670 23,500 (1.92) 10,469 68M 2T
1405/05/17 24,210 22,910 24,210 23,960 1.91 4,065 21M 500B
1405/05/14 23,510 23,510 23,510 23,510 2.98 1,144 3M 68B
1405/05/13 22,830 22,830 22,830 22,830 2.98 1,036 3M 72B
1405/05/12 22,830 22,830 22,830 22,830 2.98 1,036 3M 72B
1405/05/11 22,170 22,170 22,170 22,170 2.97 1,345 4M 87B
1405/05/10 21,530 21,500 21,530 21,530 2.97 2,286 18M 388B
1405/05/07 20,910 20,700 20,910 20,910 2.95 1,957 17M 355B
1405/05/06 20,310 20,310 20,310 20,310 2.99 1,198 4M 73B
1405/05/05 19,720 19,720 19,720 19,720 2.98 1,424 4M 84B
1405/05/04 19,150 19,150 19,150 19,150 2.96 1,289 3M 51B
1405/05/03 18,680 17,610 18,680 18,600 2.54 3,557 19M 348B
1405/04/31 18,140 18,140 18,140 18,140 2.95 1,754 6M 106B
1405/04/30 17,620 17,620 17,620 17,620 2.98 1,639 6M 103B
1405/04/29 17,110 17,110 17,110 17,110 2.95 2,452 7M 121B
1405/04/28 16,590 16,590 17,000 16,620 (2.81) 5,757 28M 468B
1405/04/27 17,100 17,100 17,120 17,100 (2.95) 751 6M 109B
1405/04/24 16,700 16,700 17,650 17,620 2.80 3,867 15M 273B
1405/04/23 17,100 17,090 17,380 17,140 (2.67) 7,178 14M 245B
1405/04/22 17,550 17,550 18,200 17,610 (2.65) 7,620 30M 530B
1405/04/21 18,090 18,090 18,090 18,090 (2.95) 847 7M 128B
1405/04/20 18,160 18,160 19,280 18,640 (0.43) 10,787 31M 581B
1405/04/17 19,030 17,930 19,030 18,720 1.30 8,452 31M 574B
1405/04/16 18,480 18,480 18,480 18,480 2.95 1,849 3M 50B
1405/04/15 17,950 17,950 17,950 17,950 2.98 1,902 4M 66B
1405/04/14 17,950 17,950 17,950 17,950 2.98 1,902 4M 66B
1405/04/13 17,950 17,950 17,950 17,950 2.98 1,902 4M 66B
1405/04/10 17,950 17,950 17,950 17,950 2.98 1,902 4M 66B
1405/04/09 17,430 17,430 17,430 17,430 2.95 2,118 4M 64B
1405/04/08 16,930 16,930 16,930 16,930 2.98 2,635 5M 87B
1405/04/07 16,460 15,550 16,460 16,440 2.81 8,270 23M 380B
1405/04/06 15,990 15,990 15,990 15,990 2.96 3,341 4M 65B
1405/04/03 15,530 15,530 15,530 15,530 2.98 3,693 3M 51B
1405/04/01 15,540 14,770 15,670 15,080 (0.92) 20,578 52M 782B
1405/03/31 15,320 14,580 15,320 15,220 2.28 17,867 94M 1T
1405/03/30 14,880 14,880 14,880 14,880 2.98 2,921 5M 71B
1405/03/25 14,450 14,450 14,450 14,450 2.99 7,930 4M 54B
1405/03/24 14,030 14,030 14,030 14,030 2.93 6,667 4M 52B
1405/03/23 13,630 13,630 13,630 13,630 2.95 5,270 3M 44B
1405/03/20 13,240 13,240 13,240 13,240 2.95 9,149 4M 57B
1405/03/19 12,860 12,860 12,860 12,860 2.96 4,703 3M 40B
1405/03/18 12,490 12,490 12,490 12,490 2.97 14,148 25M 311B
1405/03/17 12,130 12,130 12,130 12,130 2.97 7,063 4M 46B
1405/03/16 11,780 11,780 11,780 11,780 2.97 5,600 5M 59B
1405/03/13 11,590 11,110 11,790 11,440 (0.09) 42,961 81M 930B
1405/03/12 11,450 11,450 11,450 11,450 2.97 11,419 7M 84B
1405/03/11 11,120 11,120 11,120 11,120 2.96 5,874 14M 160B
1405/03/10 10,800 10,800 10,800 10,800 2.96 3,095 4M 47B
1405/03/09 10,490 10,490 10,490 10,490 2.94 8,431 4M 39B
1405/03/06 10,200 9,920 10,200 10,190 2.83 18,278 23M 238B
1405/03/05 10,200 9,920 10,200 10,190 2.83 18,278 23M 238B
1405/03/04 9,910 9,910 9,910 9,910 2.91 5,391 6M 60B
1405/03/03 9,630 9,630 9,630 9,630 2.99 3,803 2M 17B
1405/03/02 9,350 9,350 9,350 9,350 2.97 4,887 1M 14B
1405/02/30 9,080 9,080 9,080 9,080 2.95 5,008 3M 29B
1405/02/29 8,520 8,520 9,040 8,820 0.46 20,960 69M 612B
1404/12/09 8,640 8,520 8,840 8,620 (1.82) 6,730 14M 117B
1404/12/06 8,840 8,650 9,020 8,780 (1.35) 28,711 19M 169B
1404/12/05 9,000 8,900 9,000 8,900 (2.94) 32,681 32M 284B
1404/12/04 9,250 9,070 9,540 9,170 (1.93) 153,827 74M 675B
1404/12/03 9,370 9,310 9,540 9,350 (2.5) 77,737 47M 438B
1404/12/02 9,750 9,230 9,750 9,590 1.27 381,476 240M 2T
1404/11/29 9,470 9,470 9,470 9,470 2.93 15,114 18M 172B
1404/11/28 9,200 9,200 9,200 9,200 2.91 7,737 16M 151B
1404/11/27 8,940 8,940 8,940 8,940 3.00 6,128 16M 144B
1404/11/26 8,680 8,680 8,680 8,680 2.97 5,190 16M 139B
1404/11/25 8,430 8,430 8,430 8,430 2.93 5,575 16M 135B
1404/11/21 8,710 8,060 8,710 8,200 720.00 1,242,574 360M 3T